Broadway Tower – Portland, Oregon

The 19-story Broadway Tower is located on SW Broadway between SW Columbia and SW Clay Street in downtown Portland. The tower will be on the 20,000 SF portion that is zoned CxD.  This location is in the heart of downtown Portland, within a 5 minute walk of world class shopping, museums, restaurants, the South Park Blocks and Portland State University.  Several streetcar and light rail stops are located within two blocks of the site.

The nineteen story, 308,550 GSF tower will encompass 124,000 GSF, 180 key Radisson Red Hotel on the ground floor through 8th floor and a 184,000 GSF of office space on floors 9 through 19 (includes 2,200 GSF ground floor retail space at corner of SW Broadway and SW Clay).  The building will be 260′ tall with approximately 247 parking spaces to be provided on four underground parking levels.  Total Project Size is approximately 430,000 Gross Square Feet.

There will be two separate lobbies and elevator cores to service each use. The hotel lobby and three elevators are near the intersection of SW Columbia & Broadway.  The office lobby will be closer to the SW Clay and Broadway corner and include +/- 4 elevators.  Elevators will service ground floor and above grade floors for the office component and hotel component.  Parking levels will be service via two dedicated elevators.

Floor plates for the office will range in size from 8,043 (on 19th floor) to more typical of 16,650 GSF and are efficiently designed to accommodate a full floor tenant or be demised for multi-tenant down to suites as small as 1,500 square feet. 13′-6″ Office Floor to Floor Height with an emphasis on daylighting throughout.

Building amenities may include a 19th floor rooftop with indoor and outdoor meeting and communal space.  The hotel will provide world class restaurant and bar facilities on both ground floor and 2nd level outdoor patio space. Bike Friendly with Secure Bicycle Storage and shower / locker room facilities will be located on the B-1 level.

GBD is the architect and Howard S. Wright is the contractor. Construction of this $158 million commenced June 2016 and project is slated for October 2018 substantial completion.

For a virtual tour click here.